Tooting Common Lakeside Playground - Phase 2 consultation

Closed 16 Dec 2024

Opened 18 Nov 2024

Overview

Wandsworth Council is seeking your input to choose the final design for the new Tooting Commons Lakeside Playground. £384,000 has been secured by Wandsworth Council for this project. 

During the first round of consultation, held between September and November 2023, feedback was gathered on what you think of the current playground, if and how you currently use this facility and how it can be improved. Based on this feedback, three exciting playground designs have been developed.

Option A

Your browser does not support inline PDF viewing. Please download the PDF.

Option A - Diagram of playground

Option B

Your browser does not support inline PDF viewing. Please download the PDF.

Option B - Diagram of playground

Option C

Your browser does not support inline PDF viewing. Please download the PDF.

Option C - Diagram of playground

This second stage of consultation asks you to review and comment on the proposed designs. Your feedback will play a key role in helping to select the design that best serves your needs. 

Have your say

Please give us your feedback using the Online Survey link below. If you need to request a paper questionnaire or any other format, please contact parks@enablelc.org or call 0772 511 4053

Drop-in Session 

If you have any questions, join us at the drop-in session at Tooting Common Lakeside Playground on Saturday 7th December 12:00pm-3:00pm.

For updates, follow us on X @EnableParks 

What happens next

Once this phase of consultation has concluded, all of the feedback will be carefully reviewed to decide on the final design for the refurbished playground. 

While every attempt will be made to construct the final design exactly to plan, some elements may need to be altered during the implementation stage due to unforeseen technical or logistical issues. 

Areas

  • Tooting Bec

Audiences

  • Open to all

Interests

  • Wandsworth Borough