New Teddington Controlled Parking (Zone T3)

Closes 24 Oct 2021

Opened 24 Sep 2021

Overview

On 14th January the Council approved the introduction of several new Controlled Parking Zones (CPZs) across the Teddington / Strawberry Hill area.

Following some further work including consultation with your ward councillors, final proposals have been made and these include a scheme where you live.  This is to be known as the Teddington Controlled Parking Zone (T3).

As we progress implementation of the new CPZ, the Council is carrying out a ‘2nd stage’ consultation to: 

  1. Consult properties within the CPZ area on their preferred choice of operational hours (dark green shaded area on the  map here); 
  1. Consult properties outside the CPZ area, on whether they would wish to be included in the new CPZ (light green shaded area on the map here). The Council will consider adding these road(s) to the CPZ provided a connection can be formed.

The operational hours/days of the existing pay and display schemes in High Street, Broad Street and The Causeway are to remain unchanged.

As you live within the new CPZ area, we would like to hear your views:

Operational hours

The 2020 consultation results showed clear support for the zone to operate Monday to Friday but were unclear in terms of support of the operational ‘hours’.  We are asking residents in these roads to choose between 10am to noon and 10am to 4.30pm to clarify whether most support lies with short or longer operational hours.  Some key information to assist you with your response is below. 

  • The price of an annual residents’ parking permit for 10am to noon is £53.10 and for 10am to 4.30pm is £91.
  • Permit prices are reviewed annually. 
  • Subsequent permits purchased per household / business per year are approximately 50% more for the 2nd permit issued and approximately 50% more again for 3rd and subsequent permits issued per household / business. 
  • Resident visitor permits (scratchcards) currently cost £14.55 per book of ten half day permits.  These are half price to the over 60s.  One permit would be required for one full day’s parking in a 10am to noon zone. Two permits would be required in a zone that operates 10am to 4.30pm.
  • Some properties are subject to a restriction/prohibition on the issue of permits.  (These are normally properties that have been built within the last 20-25 years).
  • More information is available on the Council’s website here.

Design

Preliminary designs of the CPZ layout have been made.  These are preliminary designs (not final) and are subject to further amendments prior to finalisation. As part of the preparation of these designs, the Council has considered the requirements of the London Fire Brigade (LFB) in ensuring a minimum carriageway width of 3.1 metres is ensured in all roads for its vehicles.   Following engagement with the ward councillors, officers have amended the designs to reduce some lengths of new double yellow lines to maximise parking capacity.  Whilst we always try to maximise parking capacity and retain the existing patterns of parking, this is not always possible if roads and footways are narrow.

We have highlighted some specific roads where we expect to install new yellow lines which you may wish to be aware of, regardless of whether the CPZ is introduced in the road.  Examples of these roads in this area are: Shacklegate Lane, York Road, Victor Road, Railway Road, Luther Road, Sydney Road, Sutherland Grove, and Walpole Crescent. Others may be added when the full design is made. Please be reassured that availability levels over the zone are expected to be improved by a CPZ as commuters and long stay vehicles are deterred from parking.   

Yellow lines have been marked in front of driveways/dropped kerbs as standard. In existing zones, any bays across driveways/dropped kerbs will be removed and replaced with a yellow line. However, in most cases, there are currently two options:

1-Retain the yellow line as proposed in the preliminary design. This is recommended for those who do not wish to park in front of their driveways / dropped kerb, and would prefer to remove any ambiguity over who can park there. If this is your preferred option, there is no need for any action on your part. 

2- Ask the Council to consider omitting the yellow line and leave the area unmarked, terminating the bay on either side. This is not a clear deterrent for unauthorised parking but allows residents and their visitors to continue parking at this location. When parking during the operational days/hours of the CPZ, a valid permit must be displayed.  If this is your preferred option, please confirm this by email to the address at the top of this letter.

PLEASE NOTE:

  • The above two options are being offered on a trial basis and are subject to review.   If, at any time in the future, there are operational difficulties in maintaining this approach, the Council will review these options.  Such a review may result in one of these options being withdrawn and changes made to the line marking/restrictions across driveways/dropped kerbs.
  • Unless you have been authorised by the property owner / occupier of a certain property to park in front of their driveway/dropped kerb, you are not entitled to park there.
  • Parking is not permitted in front of entrances accessing multi-occupancy dwellings

The preliminary designs are available on the Parking Reviews webpage here.

Have your say

Please give us your views by completing the online survey below.

If you are unable to complete the survey online and you would like a hard copy of the questionnaire, please call (020) 8871 8459 leaving your name and address including postcode and quoting reference ‘T3-IN’  and one will be posted out to you with a postage paid return envelope.

Should you wish to make any additional comments, you may do so by emailing: TeddShill@richmondandwandsworth.gov.uk. Please write ‘T3IN’ in the subject heading.   All comments will be considered but it will not be possible to respond to individual e-mails/comments.

What happens next?

The Council would like to demonstrate that any measures have the support of the local community, so a good response is important. Whilst we would like to apply the most supported options among responding households, the final decision will not be based on residents’ views alone.  All feedback will be considered along with relevant traffic management and other highway factors, prior to a decision being made on the way forward.

We will write to you when a decision has been made about the future of the scheme and post the decision on our website. 

Whilst implementation of these schemes is provisionally programmed for early-mid 2022, we are not in a position to provide a firm date because of the work still to be done, the duration of which is variable.   We will write to you again with the decision and further information regarding implementation and how to obtain a permit.   Updates will be posted on the Parking Reviews webpage where a copy of the Transport and Air Quality report can also be viewed, which details the outcome of all the consultations and reviews in this area. 

Further information

Further information, including how a CPZ works, permit application criteria/guidance, all parking charges and the decision-making process, is available on the Council’s website here.  Alternatively, this information can be obtained by calling the Customer Service Centre on 020 8891 1411 and asking for the Parking Policy Team. 

Give Us Your Views

Areas

  • Fulwell and Hampton Hill Ward
  • Teddington Ward

Audiences

  • Residents
  • Businesses
  • Landlords

Interests

  • Richmond Borough